Possession · Regency Park, Greater Noida, West Phase-i (compris: RERA completion 31 Dec 2017; no OC/CC on RERA as of 04 Oct 2026 | Regency Park, Greater Noida, West Phase-ii (compri: RERA completion 31 Mar 2018; no OC/CC on RERA as of 04 Oct 20262BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Ace Divino: RERA completion 29 Oct 2023 (after extension); OC/CC uploaded on RERA 26 Jul 2023 (completion date runs past this date; may be partial)2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Ace Hanei: RERA completion 30 Oct 20283BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · AIG Royal (phase 1): RERA completion 19 Dec 2023 (after extension); OC/CC uploaded on RERA 15 Oct 2024 | AIG Royal ( Phase-2): RERA completion 19 Dec 2023 (after extension); OC/CC uploaded on RERA 15 Oct 2024 | AIG In Royal ( Phase 3): RERA completion 20 Jun 2023; OC/CC uploaded on RERA 15 Oct 2024 | Aigin Royal Phase 4: RERA completion 26 Mar 2028; OC/CC uploaded on RERA 29 Jul 2026 (completion date runs past this date; may be partial)2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · AIMS Green Avenue (phase-2): RERA completion 28 Dec 2020 (after extension); no OC/CC on RERA as of 04 Oct 2026 | AIMS Green Avenue (phase-1): RERA completion 31 Dec 2018; OC/CC uploaded on RERA 12 Oct 2021 | AIMS Green Aenue (phase-3): RERA completion 28 Dec 2020 (after extension); OC/CC uploaded on RERA 01 Oct 20252BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Aishwaryam: RERA completion 14 Nov 2019; no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Ajnara Homes (phase-1 Tower: I J K L & M): RERA completion 31 Dec 2018; OC/CC uploaded on RERA 14 Apr 2019 | Ajnara Homes (phase-2 Tower N & O): RERA completion 30 Dec 2020 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Ajnara Homes (phase-3 Plazio Convinient Shops): RERA completion 31 Dec 2018; no OC/CC on RERA as of 04 Oct 20262BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Le Garden (phase-1, Tower D E F & G): RERA completion 31 Dec 2018; OC/CC uploaded on RERA 20 Apr 2019 | Le Garden (phase-2, Tower H I J O & Q): RERA completion 28 Oct 2021 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Le Garden (phase-3, Tower K L M & N): RERA completion 31 May 2025 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Le Garden (phase-4, Le Mart Convinient Shops): RERA completion 31 Dec 2018; OC/CC uploaded on RERA 20 Apr 2019 | Le Garden (tower A B & C): RERA completion 31 Mar 2018; OC/CC uploaded on RERA 20 Apr 20192BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Alstonia Apartments: RERA completion 12 Mar 2023 (after extension); no OC/CC on RERA as of 04 Oct 20261BHK, 2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Amara Residences: RERA completion 17 Mar 2030; no OC/CC on RERA as of 05 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to moveRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Sushant Serene Residency Phase 3 Tower 10 (d) & T: RERA completion 29 Mar 2022 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Sushant Serene Residency Phase 4 Tower T8b & T12e&: RERA completion 30 Sep 2022 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Sushant Serene Residency Ph1 T7b1 & T6d: RERA completion 30 Sep 2019; OC/CC uploaded on RERA 06 Jan 2020 | Sushant Serene Residency Ph2 T3e,t4e,t5d: RERA completion 30 Sep 2021 (after extension); no OC/CC on RERA as of 04 Oct 20261BHK, 2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Antriksh Golf Links (phase-1): RERA completion 18 Aug 2021 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Antriksh Golf Link Phase 2: RERA completion 24 Nov 2021 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Antriksh Golf Link (phase 3): RERA completion 27 Dec 2021 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Antriksh Valley: RERA completion 31 Dec 2027 (after extension); OC/CC uploaded on RERA 26 Feb 2026 (completion date runs past this date; may be partial)RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Apex Court: RERA completion 29 Dec 2020 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Apex Golf Avenue: RERA completion 30 Jun 2019; no OC/CC on RERA as of 04 Oct 20262BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Arihant One: RERA completion 15 Sep 20273BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Ashtech Presidential Towers: RERA completion 09 Sep 2030RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · ATS Destinaire: RERA completion 30 Nov 2026 (after extension)3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · ATS Dolce: RERA completion 04 Nov 2025 (after extension); OC/CC uploaded on RERA 23 May 2025 (completion date runs past this date; may be partial)2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Nobility: RERA completion 31 Jan 2027 (after extension); OC/CC uploaded on RERA 24 Apr 2024 (completion date runs past this date; may be partial)3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Bulland Calisto: RERA completion 30 Jun 2021 (after extension); no OC/CC on RERA as of 05 Oct 2026 | Bulland Calisto Phase-II: RERA completion 29 Dec 2022 (after extension); no OC/CC on RERA as of 05 Oct 2026 | Bulland Calisto Phase-III: RERA completion 30 Jun 2024 (after extension); no OC/CC on RERA as of 05 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Bulland Elevates: RERA completion 31 Dec 2018; no OC/CC on RERA as of 04 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Casa Grande: RERA completion 30 Nov 2017; no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Casa Grande2-towera1: RERA completion 30 Dec 2029 | Casa Grande-2: RERA completion 05 Oct 2026 (after extension); OC/CC uploaded on RERA 10 Feb 2026 (completion date runs past this date; may be partial)RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Casa Woodstock: RERA completion 31 Dec 2018; no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Civitech Strings: RERA completion 10 Jul 20272BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Coco County: RERA completion 30 Sep 2025 (after extension); OC/CC uploaded on RERA 07 Dec 2023 (completion date runs past this date; may be partial)3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · CRC Joyous: RERA completion 27 Sep 20271BHK, 2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · CRC Maesta: RERA completion 21 May 20293BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · CRC Sublimis: RERA completion 03 Sep 2024 (after extension); OC/CC uploaded on RERA 17 Dec 2022 (completion date runs past this date; may be partial)2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Crown Residences At Godrej Golf Links: RERA completion 06 May 20303BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
1BHK, 2BHK, 3BHKRERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Devika Gold Homz: RERA completion 29 Dec 2020 (after extension); OC/CC uploaded on RERA 18 Dec 2020 (completion date runs past this date; may be partial)2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Divyansh Flora: RERA completion 31 Jul 2018; OC/CC uploaded on RERA 16 Apr 2019 | Divyansh Flora: RERA completion 30 Jun 2018; no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Durva Greens: RERA completion 31 Dec 2017; no OC/CC on RERA as of 04 Oct 20263BHK, 5BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Earth Gracia: RERA completion 30 Jun 2021 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Casa Royale & Sanskriti: RERA completion 31 Mar 2019; no OC/CC on RERA as of 04 Oct 20262BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Eldeco 7 Peaks Residences: RERA completion 14 Nov 20303BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Eldeco La Vida Bella: RERA completion 16 Jan 20292BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
2BHK, 3BHK, 4BHK PenthouseRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Elegant Splendour Phase-1: RERA completion 21 Dec 2023 (after extension); OC/CC uploaded on RERA 04 Sep 2025 | Elegant Splendour Phase-3: RERA completion 21 Dec 2025 (after extension); OC/CC uploaded on RERA 15 Sep 2025 (completion date runs past this date; may be partial)2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Elegant Ville Phase-1: RERA completion 14 Sep 2024 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Elegant Ville Phase-3: RERA completion 14 Sep 2024 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Elegant Ville Phase-4: RERA completion 14 Sep 2024 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Elite XSector 10 Greater Noida West, Greater Noida · Golfgreen Mansions PVT. LTD. + ShortlistPossession · Elite X: RERA completion 12 Dec 2028RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Eros Sampoornam 2: RERA completion 31 Jul 2026 (after extension); no OC/CC on RERA as of 04 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Eros Sampoornam 3: RERA completion 31 Dec 2028RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Eros Sampoornam I: RERA completion 30 Jun 2024 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Express Astra (phase-1): RERA completion 12 Mar 2026; no OC/CC on RERA as of 04 Oct 2026 | Express Astra (phase-ii): RERA completion 12 Mar 2026; no OC/CC on RERA as of 04 Oct 20262BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Flora Heritage: RERA completion 30 Dec 2024 (after extension); OC/CC uploaded on RERA 18 Oct 2022 (completion date runs past this date; may be partial)RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Future Estate (phase-fe-1): RERA completion 31 Jul 2026 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Future Estate(phase-fe-2): RERA completion 31 Jul 2026 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Future Estate (phase-fe-3): RERA completion 31 Jul 2026 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Future Estate (phase -fe-4): RERA completion 31 Jul 2026 (after extension); no OC/CC on RERA as of 04 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Galaxy Royale Ph1 Towers A Keshav/b Gokul/csc: RERA completion 31 Mar 2018; OC/CC uploaded on RERA 13 Jul 2020 | Galaxy Royale ,phase-2(tower C Vrindavan,club): RERA completion 29 Nov 2021 (after extension); OC/CC uploaded on RERA 13 Jul 2020 (completion date runs past this date; may be partial)2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to moveRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Gaur Mulberry Mansions - FH-03: RERA completion 01 Nov 2022 (after extension); no OC/CC on RERA as of 05 Oct 2026 | Gaur Mulberry Mansions - FH-02: RERA completion 30 May 2023 (after extension); no OC/CC on RERA as of 05 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · The Islands: RERA completion 03 Apr 20304BHK, 5BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Gayatri Aura: RERA completion 18 Jul 2024 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Gayatri Life: RERA completion 30 Sep 2025 (after extension); no OC/CC on RERA as of 04 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Godrej Arden: RERA completion 15 May 20303BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Godrej Majesty Gh-01/b,c,d,e.j And K Sec 12 -g Noida: RERA completion 16 Feb 20303BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Golden Grande "phase-1": RERA completion 30 Dec 2025 (after extension); OC/CC uploaded on RERA 12 Aug 2026 | Golden Grande (phase-2): RERA completion 30 Sep 2026; no OC/CC on RERA as of 04 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Greenarch Phase-1: RERA completion 28 Feb 2018; OC/CC uploaded on RERA 18 Mar 2024 | Greenarch Phase-2: RERA completion 27 Feb 2020 (after extension); OC/CC uploaded on RERA 29 Jan 2021 | Greenarch Phase-3: RERA completion 04 Jan 2023 (after extension); OC/CC uploaded on RERA 14 Dec 2022 (completion date runs past this date; may be partial)2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Gulshan Avante: RERA completion 30 Apr 2028; no OC/CC on RERA as of 05 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Happy Trails: RERA completion 29 Oct 2025 (after extension); OC/CC uploaded on RERA 21 Aug 2024 (completion date runs past this date; may be partial)RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to moveRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Heritage Skyward: RERA completion 31 Dec 20273BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Himalaya Pride (phase 1 : Tower A & B): RERA completion 31 Dec 2018; OC/CC uploaded on RERA 05 Aug 2020 | Himalaya Pride (phase 2 : Tower C): RERA completion 31 Dec 2019; OC/CC uploaded on RERA 05 Aug 2020 | Himalaya Pride (phase 3 : Tower D): RERA completion 30 Jun 2021 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to moveRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Intellicity@phase-1: RERA completion 24 Dec 2019; no OC/CC on RERA as of 04 Oct 2026 | Intellicity @phase-3 Spine (tower-a & B): RERA completion 30 Jun 2022 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Intellicity @phase 4 (occi & Cerebrum): RERA completion 30 Jun 2023 (after extension); no OC/CC on RERA as of 04 Oct 20263BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Irish Platinum: RERA completion 31 Jan 20293BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Jaypee Greens Sun Court - B, Greater Noida: RERA completion 29 Sep 2021 (after extension); no OC/CC on RERA as of 04 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · JKG Palm Court Phase-i: RERA completion 30 Jun 2019; no OC/CC on RERA as of 04 Oct 2026 | JKG Palm Court Phase-ii: RERA completion 09 Nov 2020 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · JMDR Arihant Green: RERA completion 31 Dec 2027 (after extension)2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · JNC The Park: RERA completion 31 Dec 2019; no OC/CC on RERA as of 04 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Kbnows Apartment: RERA completion 30 Jun 2018; no OC/CC on RERA as of 04 Oct 20263BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Kings Park: RERA completion 29 Dec 2021 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · KVD Windpark: RERA completion 10 Mar 2029 (after extension)2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · La Palacia: RERA completion 30 Jun 2024 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · La Residentia: RERA completion 30 Jun 2023 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
La SolaraSector 16 Greater Noida West, Greater Noida · Belgravia Projects Private Limited + ShortlistReady to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Legacy By Gaurs: RERA completion 28 Sep 2029RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Mahagun Mantra 1: RERA completion 29 Dec 2020 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Mahagun Mantra II: RERA completion 29 Dec 2021 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Mahagun My Laagoon Phase 1: RERA completion 29 Apr 20293BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Mangalya Ophira: RERA completion 29 Dec 2019 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Manorath: RERA completion 29 Dec 2021 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Mayfair Residency: RERA completion 31 Dec 2028 (after extension)2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Meghdutam Encore: RERA completion 30 Jun 2021 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Migsun Jorbagh (formerly The Hemisphere_phase-2_expa Villas): RERA completion 08 Jun 2023 (after extension); no OC/CC on RERA as of 04 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Migsun Twiinz (Formerly Known as Migsun Wynn): RERA completion 27 Jul 2024 (after extension); OC/CC uploaded on RERA 22 Jan 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Morpheus Pratiksha: RERA completion 06 Feb 2030 (after extension)2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · NCR Monarch: RERA completion 31 Dec 2026 (after extension); OC/CC uploaded on RERA 02 Jan 2026 (completion date runs past this date; may be partial)1BHK, 2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Nirala Aspire Phase-ii (b1 To B10, B12 , B14): RERA completion 20 Feb 2025; no OC/CC on RERA as of 04 Oct 2026 | Nirala Aspire Ph-iv (b11, B15 To B23): RERA completion 31 Dec 2024; no OC/CC on RERA as of 04 Oct 2026 | Nirala Aspire Ph1 (a1 To A8 & D1 To D5): RERA completion 30 Sep 2018; OC/CC uploaded on RERA 07 Jun 20252BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Nirala Estate Phase-ii: RERA completion 17 May 2025 (after extension); OC/CC uploaded on RERA 26 Jul 2023 (completion date runs past this date; may be partial) | Nirala Estate Phase-iii: RERA completion 24 Dec 2026; OC/CC uploaded on RERA 27 Nov 2023 (completion date runs past this date; may be partial) | Nirala Estate Phase-iv: RERA completion 24 Dec 2026; OC/CC uploaded on RERA 27 Nov 2023 (completion date runs past this date; may be partial) | Nirala Estate Phase-v: RERA completion 30 Nov 2027; OC/CC uploaded on RERA 13 May 2025 (completion date runs past this date; may be partial)2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Nirala Greenshire Ph-1 (g6-g12,g14): RERA completion 29 Mar 2022 (after extension); OC/CC uploaded on RERA 19 May 2026 | Nirala Greenshire Ph-ii: RERA completion 31 Dec 2027 (after extension)2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Novena Green: RERA completion 30 Jun 2027 (after extension); OC/CC uploaded on RERA 18 Feb 2026 (completion date runs past this date; may be partial)2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Nxone - Hive: RERA completion 31 Dec 20263BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Palm Olympia Ph 3: RERA completion 30 Apr 2028 | Palm Olympia Ph 2: RERA completion 30 Apr 20283BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Panchsheel Greens: RERA completion 01 Sep 2020; no OC/CC on RERA as of 04 Oct 2026 | Panchsheel Greens Phase - 1 (b1 To B3,f4 To F6 & C: RERA completion 30 May 2018; OC/CC uploaded on RERA 23 Apr 20192BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Panchsheel Greens -ii (tower - A1 To A6,b1 To B7): RERA completion 06 Jun 2018; OC/CC uploaded on RERA 04 Oct 2023 | Panchsheel Greens - II (tower-c1 To C4,188 Villas): RERA completion 24 Nov 2019 (after extension); OC/CC uploaded on RERA 12 Mar 2022 | Panchsheel Greens-ii(tower - E1 To E4,commercial,n: RERA completion 28 Nov 2022 (after extension); OC/CC uploaded on RERA 10 Oct 2024 | Panchsheel Greens - II (tower - D1,d2& E5): RERA completion 30 Nov 2026 (after extension); OC/CC uploaded on RERA 04 Oct 2023 (completion date runs past this date; may be partial) | Panchsheel Greens - II (tower - E6,e7,d3 &d4): RERA completion 30 Nov 2026 (after extension)2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Panchsheel Hynish Phase -1 (tower-t8 &t9): RERA completion 08 May 2018; OC/CC uploaded on RERA 23 Apr 2019 | Panchsheel Hynish Phase-2(tower- T10 & T11): RERA completion 01 Oct 2019; OC/CC uploaded on RERA 31 Aug 2019 (completion date runs past this date; may be partial) | Panchsheel Hynish Phase -3 (tower - T12): RERA completion 01 Jan 2021 (after extension); no OC/CC on RERA as of 04 Oct 20262BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Panchsheel Pinnacle Phase - 1 (tower - F2 & F3) Pa: RERA completion 29 Sep 2020 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Panchsheel Pinnacle Phase-2 (tower F1)part Of Panc: RERA completion 28 Feb 2023 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move1BHK, 2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Parsvnath Palacia Phase-i: RERA completion 14 Dec 2021 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Parsvnath Palacia Phase-ii: RERA completion 02 Aug 2022 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHK, 5BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Pristine Avenue: RERA completion 31 Dec 2017; no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Purvanchal Royal City: RERA completion 31 Mar 2019; OC/CC uploaded on RERA 19 Jun 2020 | Purvanchal Royal City (phase-ii): RERA completion 31 Dec 2023 (after extension); OC/CC uploaded on RERA 16 Dec 2023 (completion date runs past this date; may be partial)3BHK, 4BHK, 5BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Renox Thrive: RERA completion 24 Apr 2029; no OC/CC on RERA as of 05 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Towers K And L (r G Luxury Homes): RERA completion 30 Sep 2025 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Towers I And J (r G Luxury Homes): RERA completion 31 Mar 2026; no OC/CC on RERA as of 04 Oct 2026 | RG Luxury Homes - Tower B, C, D & E: RERA completion 29 Mar 2021 (after extension); OC/CC uploaded on RERA 11 Dec 2024 | RG Luxury Homes - Tower A, F & M: RERA completion 29 Mar 2021 (after extension); OC/CC uploaded on RERA 30 May 2025 | RG Luxury Homes (tower G & H): RERA completion 29 Mar 2021 (after extension); OC/CC uploaded on RERA 12 Dec 2025 | RG Luxury Homes-4 (tower J K & L): RERA completion 30 Jun 2026 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Rhythm County(phase Rc-1): RERA completion 31 Jul 2026 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Rhythm County (phase Rc-2): RERA completion 31 Jul 2027 (after extension) | Rhythm County (phase Rc-3): RERA completion 31 Jul 2026 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Rise Sports Villas: RERA completion 29 Dec 2023 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Rise Sports Villas , Super 30 Villas: RERA completion 29 Dec 2023 (after extension); no OC/CC on RERA as of 04 Oct 20263BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Rudra Palace Heights: RERA completion 31 Dec 2026 (after extension); OC/CC uploaded on RERA 31 Mar 2026 (completion date runs past this date; may be partial)1BHK, 2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Ryne: RERA completion 09 Oct 2022 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Saya Zion: RERA completion 30 Jun 2019; OC/CC uploaded on RERA 15 Apr 2019 (completion date runs past this date; may be partial)2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Shivalik Homes 2: RERA completion 31 Dec 2028 (after extension)2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Shri Radha Aqua Gardens: RERA completion 20 Dec 2026 (after extension); OC/CC uploaded on RERA 22 Dec 2025 (completion date runs past this date; may be partial)RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Shri Radha Sky Park (sky Gardens Phase-2): RERA completion 08 Sep 2029 (after extension)2BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Signature Park: RERA completion 06 Jun 20291BHK, 2BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Sikka Kaamya Greens: RERA completion 30 Apr 2026 (after extension); no OC/CC on RERA as of 04 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Singapore Residency: RERA completion 30 Dec 2012; no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · SKA Destiny One: RERA completion 20 Jan 20293BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · SKA Divya Towers: RERA completion 30 Sep 2024; OC/CC uploaded on RERA 11 Jul 2024 (completion date runs past this date; may be partial)3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · SKA Estate: RERA completion 23 Jan 20303BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to moveRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Skytech Colours Avenue Tower C: RERA completion 04 Dec 2030 | Skytech Colours Avenue (towers A-b-d-e & Shops): RERA completion 20 Aug 2028 (after extension)2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Sobha Aurum: RERA completion 30 Apr 20302BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Sobha Rivana: RERA completion 07 Feb 2031RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Spring Elmas: RERA completion 15 Dec 20293BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Spring Homes: RERA completion 31 Dec 20263BHK, 4BHK, 5BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move1BHK, 2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Stellar One Phase III: RERA completion 26 Oct 2028 | Stellar One Phase 1: RERA completion 29 Sep 2020 (after extension); OC/CC uploaded on RERA 14 Jul 2023 | Stellar One Phase II: RERA completion 15 Nov 20282BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Supertech Czar: RERA completion 30 Dec 2018; no OC/CC on RERA as of 04 Oct 20261BHK, 2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Supertech Eco Village-i (phase-i): RERA completion 30 Sep 2018 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Supertech Eco Village-i (phase-ii): RERA completion 30 Nov 2019 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Supertech Eco Village-i (phase-iii): RERA completion 29 Jan 2023 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Supertech Eco Village-i Phase I-c: RERA completion 30 Dec 2017; OC/CC uploaded on RERA 27 Nov 20191BHK, 2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Eco Village-ii (phase-i): RERA completion 30 Sep 2018 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Supertech Eco Village-ii (phase-ii): RERA completion 28 Apr 2021 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Supertech Eco Village-ii (phase-iii): RERA completion 27 Aug 2021 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Supertech Eco Village-ii (phase-iv): RERA completion 29 Jun 2023 (after extension); no OC/CC on RERA as of 04 Oct 2026 | Supertech Eco Village-ii Phase I-c: RERA completion 30 Dec 2017; OC/CC uploaded on RERA 27 Oct 20202BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Supertech Eco Village-III (Phase-I): RERA completion 31 Mar 2019; OC/CC uploaded on RERA 07 Jan 2020 | Supertech Eco Village-III (Phase-II): RERA completion 31 Dec 2019; no OC/CC on RERA as of 05 Oct 2026 | Supertech Eco Village-3 Phase-3: RERA completion 30 Nov 2021 (after extension); no OC/CC on RERA as of 05 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · SVG Hightes: RERA completion 30 Apr 2021 (after extension); OC/CC uploaded on RERA 05 Aug 2020 (completion date runs past this date; may be partial)1BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · The Brook Phase-2: RERA completion 13 May 2029 | The Brook- Phase 1: RERA completion 05 Jun 20292BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · The Peridona C-1 Jaypee Greens: RERA completion 04 Feb 20304BHK, 5BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · The Rivulet Phase-1: RERA completion 03 Apr 2030RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Trecento Residences-a: RERA completion 17 Jul 20284BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Unibera Elite 70: RERA completion 30 Jan 2022 (after extension); no OC/CC on RERA as of 04 Oct 20263BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Unibera Towers: RERA completion 30 Nov 2019 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Unitech Habitat: RERA completion 30 Jun 2021 (after extension); no OC/CC on RERA as of 04 Oct 20262BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Vaibhav Heritage Height: RERA completion 30 Jan 2028 (after extension)2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
RERA no. not added yet
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Vedantam Phase 1 (tower E1, E2, D1, B2 & A): RERA completion 31 Mar 2018; no OC/CC on RERA as of 04 Oct 2026 | Vedantam Phase-2( Tower B1, C2 & C1): RERA completion 31 Dec 2018; no OC/CC on RERA as of 04 Oct 2026 | Vedantam Phase-3(tower D2f & G): RERA completion 31 Dec 2019; no OC/CC on RERA as of 04 Oct 20261BHK, 2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Victoryone Amara: RERA completion 23 Aug 2028 (after extension)RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · Victoryone Central: RERA completion 18 Mar 2028 (after extension); OC/CC uploaded on RERA 29 Jan 2026 (completion date runs past this date; may be partial)2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · VVIP Addresses Greater Noida (west): RERA completion 18 Sep 20293BHK, 4BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · White House Apartments: RERA completion 31 Dec 2019; no OC/CC on RERA as of 04 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Ready to move2BHK, 3BHKRERA on file
Trust score · 0 of 5 site updates·0 verified buyers
Possession · WTC Noida- Quad: RERA completion 30 Jun 2025 (after extension); no OC/CC on RERA as of 04 Oct 2026RERA on file
Trust score · 0 of 5 site updates·0 verified buyers